Total EV Charging Station
MM Alam Rd, Block B1, Gulberg III, Lahore, Punjab · 0.7 km from Lahore centre Community listing
- Maximum power
- 120 kW — DC fast
- Connectors
- CCS2
- Price
- PKR 120/kWh (reported by drivers — advisory)
- Operator
- HUBCO Green (PK)
- Location
- 31.51696, 74.35250 · Directions
Check the latest driver reports, confirm it works, or report a problem — all in the app. Open in Sarai